Table 4. 
Requirements During Renewal of Approval
Sl.No. Name of the component Document Study and Documentation Infrastructure Assessment Component /Raw Material Testing at Approved Labs Component /Raw Material Testing at CACT
1 Optic Fiber Yes No No No
2 Patch cords and Pigtails Yes Yes Yes Yes
3 FC PC Adaptors Yes Yes Yes Yes
4 Splice protection sleeve Yes Yes Yes Yes
5 Splice protection sleeve-Ribon  Yes Yes No No
6 Cable Filling Compound Yes Yes Yes Yes
7 Cable Flooding Compound Yes Yes Yes Yes
8 Co Polymer Coated SS Tape Yes Yes Yes Yes
9 FRP rod Yes Yes Yes No
10 GS Tape Yes Yes Yes Yes
11 HDPE Resin Yes No Yes Yes
12 Impregnated Glass Fiber Reinforcement Yes Yes Yes Yes
13 Impregnated Semi Rigid FRP Rod Yes Yes Yes No
14 Insulation Compound Yes Yes Yes Yes
15 Nylon thread binder Yes No No Yes
16 PBTP Yes No Yes Yes
17 Poly Aluminium Tape Yes Yes Yes Yes
18 Polyamide-11, 12 Yes No Yes Yes
19 Polyester Tape - OFC Yes Yes No Yes
20 PVC Compound Yes Yes Yes Yes
21 PVC Resin Yes No No Yes
22 Sheathing and Jacketing Compound Yes Yes Yes Yes
23 Sheathing Compound - OFC Yes Yes Yes Yes
24 Tube Filling Compound Yes Yes Yes Yes
25 Water Swellable Tape - OFC Yes Yes Yes No
26 Coil Cord Yes No No Yes
27 Contactors Yes Yes Yes No
28 Filters Yes No No Yes
29 Fuses Yes No Yes No
30 GD Tubes Yes No Yes No
31 Line Cord Yes No No Yes
32 MCB, MCCB, RCBO, RCCB Yes Yes Yes No
33 Modular Jacks Yes No Yes No
34 Modular Plugs Yes No Yes No
35 MOV's Yes No Yes No
36 Panel Meters Yes Yes Yes No
37 Relays Yes No Yes No
38 Potentiometers / Cermet Trimmer, WW Yes No No Yes
39 S P D Yes Yes Yes No
40 Switches Yes No Yes No
41 Transformers,Chokes Inductors  Yes No No Yes
* Note  In addition to the above, any adverse feedback or any change in Specification or Design or raw material or  manufacturing process of the Approved  Components/ Materials,will call for  fresh Infrasructure Assessment and Testing during Renewal of Approvals.